DMS Technologies Anderson Jack Plug Adaptor With 200mm Long Leads - Electrical

Price: 52.50 GBP Condition: New



Use this page to compare prices and key details for DMS Technologies Anderson Jack Plug Adaptor With 200mm Long Leads - Electrical. We summarise the important specs and give quick buying tips so you can choose confidently. Looking at DMS Technologies Anderson Jack Plug Adaptor With 200mm Long Leads - Electrical? Below you’ll find a clear overview of the main features, what to check before buying, and how to compare offers from different sellers. Here’s a practical summary of DMS Technologies Anderson Jack Plug Adaptor With 200mm Long Leads - Electrical — including key item specifics, condition guidance, and what typically affects price so you can spot a good deal.



Item Specifics


Related searches: Vehicle Parts & Accessories    |   Car Tuning & Styling    |   Electrical Components    |   Terminals & Connectors

Description:

The 200mm long cables have a small plug at one end and a large at the other. Not always. as you may require it in the event of a claim with your carrier. I'VE ADDED A NOTE TO MY ORDER, CAN YOU VIEW IT?. DMS



Manufacturer: DMS

Brand: DMS

MPN: 7600-0036

Country of Origin: United Kingdom

Manufacturer Part Number: 7600-0036

Type: Jack Plug Adaptor

Brand Type: Aftermarket Branded



Buying tips

Before you buy, check that the key specs match your needs (compatibility, size/fit, and any included accessories). Also confirm the seller’s returns policy and the delivery estimate. It’s worth comparing more than just price: condition, included parts, warranty/returns, and delivery costs can change the overall value. If you’re unsure, prioritise listings with clear photos and complete specifics. To avoid surprises, confirm model/variant details and look for accurate photos. If you’re buying used, pay attention to wear, working status, and what’s included in the box.

Price notes

Prices can vary based on condition, completeness (box/accessories), and seller location. Compare multiple listings to get a realistic range before deciding. The best value usually comes from the right mix of condition and total cost (item price + delivery). Check if the listing includes essential accessories to avoid extra spend. If you see big price differences, it’s often down to condition, extras, or shipping. Compare similar-spec listings rather than only the cheapest result.

Condition notes

Condition matters a lot for resale and reliability. Make sure the listing photos and description match the stated condition, and double-check any notes about faults or cosmetic wear. For used items, look for clear evidence of working status and any included accessories. If the condition is unclear, consider messaging the seller before purchase. If the item is listed as refurbished or pre-owned, verify what “refurbished” means for that seller (tested, repaired, cleaned) and whether returns are offered.

FAQ

What should I check before buying DMS Technologies Anderson Jack Plug Adaptor With 200mm Long Leads - Electrical?

Confirm the key specs (compatibility, size, and included accessories), then compare total cost (price + delivery). Review photos, condition notes, and the returns policy.

Why do prices vary for DMS Technologies Anderson Jack Plug Adaptor With 200mm Long Leads - Electrical?

Price differences are usually caused by condition, included extras, seller reputation, and delivery costs. Compare listings with the same model/variant for a fair comparison.

Is this page an official store?

No — Chumbay helps you compare offers from sellers. Availability and final pricing depend on the marketplace listing.



SIMILAR & RECOMMENDED:
PowaKaddy Plug N Play Adaptor 3 Way Anderson Plug Golf Battery Connector Cable

PowaKaddy Plug N Play Adaptor 3 Way Anderson Plug Golf Battery Connector Cable

8.95 GBP

200 Amp Jump Leads to SB175 Grey Anderson Plug - Heavy Duty - 35mm² - 5 Metres

200 Amp Jump Leads to SB175 Grey Anderson Plug - Heavy Duty - 35mm² - 5 Metres

106.00 GBP

200 Amp Jump Leads to SB175 Grey Anderson Plug - Heavy Duty - 35mm² - 4 Metres

200 Amp Jump Leads to SB175 Grey Anderson Plug - Heavy Duty - 35mm² - 4 Metres

92.00 GBP

1 Amp Small Fuses Shaver Adaptor Fuse Pack of 4 1A BS646 Electrical Plug

1 Amp Small Fuses Shaver Adaptor Fuse Pack of 4 1A BS646 Electrical Plug

3.89 GBP

SMJ Electrical Universal to UK Adaptor Plug Tourist Adapter, Black (TADBCC)

SMJ Electrical Universal to UK Adaptor Plug Tourist Adapter, Black (TADBCC)

4.91 GBP

175A 4 Gauge Battery Quick Connect Disconnect Anderson style DC Electrical Winch

175A 4 Gauge Battery Quick Connect Disconnect Anderson style DC Electrical Winch

13.99 GBP

2m PRO OFC 3.5mm Stereo Jack Plug to 6.35mm 1/4 inch Stereo Jack Plug Cable [007

2m PRO OFC 3.5mm Stereo Jack Plug to 6.35mm 1/4 inch Stereo Jack Plug Cable [007

5.50 GBP

600KG Transmission Jack Adaptor Gearbox Removal Adaptor Loading Automotive Tool.

600KG Transmission Jack Adaptor Gearbox Removal Adaptor Loading Automotive Tool.

44.99 GBP